<?xml version="1.0" encoding="utf-8" ?>

<rss version="2.0" 
   xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
   xmlns:admin="http://webns.net/mvcb/"
   xmlns:dc="http://purl.org/dc/elements/1.1/"
   xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
   xmlns:wfw="http://wellformedweb.org/CommentAPI/"
   xmlns:content="http://purl.org/rss/1.0/modules/content/"
   >
<channel>
    <title>eXpect delaYs Travel Delay Blog - Traffic</title>
    <link>http://expectdelays.com/cblog/</link>
    <description>How to Beat and Survive Travel Delays!</description>
    <dc:language>en</dc:language>
    <generator>Serendipity 1.2.1 - http://www.s9y.org/</generator>
    <pubDate>Sat, 12 Jul 2008 01:45:23 GMT</pubDate>

    <image>
        <url>http://expectdelays.com/cblog/templates/bulletproof_v1_2/img/s9y_banner_small.png</url>
        <title>RSS: eXpect delaYs Travel Delay Blog - Traffic - How to Beat and Survive Travel Delays!</title>
        <link>http://expectdelays.com/cblog/</link>
        <width>100</width>
        <height>21</height>
    </image>

<item>
    <title>PENNDOT PITTSBURGH AREA TRAFFIC AND ROAD CONSTRUCTION NEWS RELEASES</title>
    <link>http://expectdelays.com/cblog/archives/354-PENNDOT-PITTSBURGH-AREA-TRAFFIC-AND-ROAD-CONSTRUCTION-NEWS-RELEASES.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/354-PENNDOT-PITTSBURGH-AREA-TRAFFIC-AND-ROAD-CONSTRUCTION-NEWS-RELEASES.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=354</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=354</wfw:commentRss>
    

    <author>nospam@example.com (Gus)</author>
    <content:encoded>
    &lt;h5&gt;These are recent PENNDOT News Releases about Pittsburgh area road construction, road closures, and other road and highway information.&lt;/h5&gt;

&lt;div align=&quot;center&quot;&gt;
&lt;!-- iFrame for PENNDOT releases --&gt;
PENNDOT Media Releases - Road Construction &amp;amp; Closure Notices from the PENNDOT web site&lt;br /&gt;
(Use the &lt;span class=&quot;bodyTextBlBold&quot;&gt;back&lt;/span&gt; button on your browser to return to the main list after viewing a media release)&lt;br /&gt; 
&lt;iframe width=&quot;600&quot; height=&quot;300&quot; src=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/vMRbyCounty?OpenView&amp;Start=1&amp;Count=30&amp;Expand=1#1&quot;&gt;
&lt;/iframe&gt;
&lt;/div&gt;

&lt;p&gt;
Remember, if you eXpect delaYs around Pittsburgh, you can beat them!&lt;br /&gt;
-Gus
&lt;/p&gt;  
    </content:encoded>

    <pubDate>Fri, 11 Jul 2008 18:27:47 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/354-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 3, 2008 - ROUTE 65 RAMP IMPROVEMENTS CONTINUE MONDAY IN PITTSBURGH</title>
    <link>http://expectdelays.com/cblog/archives/349-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-65-RAMP-IMPROVEMENTS-CONTINUE-MONDAY-IN-PITTSBURGH.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/349-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-65-RAMP-IMPROVEMENTS-CONTINUE-MONDAY-IN-PITTSBURGH.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=349</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=349</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; –&lt;/span&gt;&lt;/b&gt; PennDOT District 11 is advising motorists that improvement work will continue on the ramp from eastbound (inbound) Route 65 to northbound (outbound) I-279 (Parkway North) over Scotland Avenue in City of Pittsburgh, Allegheny County, on Monday, July 7, 2008.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Contractor crews will be continuing bridge joint and expansion dam repairs on the ramp. Crews were unable to complete the work in June due to inclement weather. Various lane closures and restrictions will occur on the ramp daily from &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;9 a.m. to 3 p.m. through Friday, July 11, 2008. The ramp will remain open to traffic. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The prime contractor performing the repairs is Mascaro Contracting of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Pittsburgh under a $3.5 million contract to conduct repairs on numerous bridges in Allegheny County.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT advises motorists to use caution, slow down, and expect changing traffic patterns when traveling through the area. Work zone safety is everyone’s responsibility.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Thu, 03 Jul 2008 17:02:36 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/349-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 3, 2008 - ROUTE 50 (WASHINGTON PIKE) IMPROVEMENTS AT GREENTREE ROAD INTERSECTION BEGIN MONDAY</title>
    <link>http://expectdelays.com/cblog/archives/348-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-50-WASHINGTON-PIKE-IMPROVEMENTS-AT-GREENTREE-ROAD-INTERSECTION-BEGIN-MONDAY.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/348-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-50-WASHINGTON-PIKE-IMPROVEMENTS-AT-GREENTREE-ROAD-INTERSECTION-BEGIN-MONDAY.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=348</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=348</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh, PA – &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;PennDOT District 11 is advising motorists that lane closures and other restrictions will begin on Monday, July 7, 2008, on Route 50 (Washington Pike) at the intersection of Route 3052 (Greentree Road) and the newly constructed Walgreens in the Borough of Heidelberg, Allegheny County. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic will be reduced to a single lane in each direction on Route 50 daily between &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;9 a.m. to 3 p.m. through early August to allow contractor crews to modify median islands, install new traffic signals, and improve storm water sewer systems as part of the new development. Frank J. Zottola Construction is performing the work under a contract with the developer. &lt;u&gt;PennDOT is releasing this information as a public service only because the work is occurring on a state route.&lt;/u&gt;&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT advises motorists to use caution, slow down, and expect changing traffic patterns when traveling through the area. Work zone safety is everyone’s responsibility.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Media and other inquiries should contact &lt;u&gt;412-321-3212&lt;/u&gt; or &lt;u&gt;724-816-2743&lt;/u&gt; for more information.    &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Thu, 03 Jul 2008 16:59:21 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/348-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 3, 2008 - NORTHBOUND ROUTE 51 RAMP TO BRIDGE STREET CLOSING MONDAY IN BRIDGEWATER</title>
    <link>http://expectdelays.com/cblog/archives/347-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-NORTHBOUND-ROUTE-51-RAMP-TO-BRIDGE-STREET-CLOSING-MONDAY-IN-BRIDGEWATER.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/347-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-NORTHBOUND-ROUTE-51-RAMP-TO-BRIDGE-STREET-CLOSING-MONDAY-IN-BRIDGEWATER.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=347</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=347</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; – &lt;/span&gt;&lt;/b&gt;PennDOT District 11 is advising motorists the off-ramp from northbound Route 51 to Bridge Street in the Borough of Bridgewater, Beaver County, will be closed beginning on Monday, July 7, 2008. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The ramp will be closed beginning at &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;7 a.m. on Monday for approximately one week through July 14 for concrete patching and repair. Signs will be posted to guide motorists during the closure. The posted detour will be:&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 45pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Continue northbound on Route 51&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 45pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Turn right onto Leopard Lane&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 45pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Take Leopard lane to Market Street (Route 4042) &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 45pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Make right onto Market Street and follow to Bridge Street &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The ramp repairs are included in a $3.2 million project to improve the Route 51 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Constitution Boulevard) Bridgewater Interchange in the Boroughs of Beaver and Bridgewater, Beaver County. The project includes concrete patching and overlay on Route 51, a new ramp from Bridge Street to northbound Route 51, traffic signal upgrades, drainage repairs, guiderail, bridge deck repairs, and other improvements from the south end of the Beaver-Rochester Bridge to approximately 800 feet north of Bridge Street.  Traffic on Route 51 is currently reduced to a single lane around-the-clock in each direction through the interchange area.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The prime contractor for the project is the John Gulisek Construction Company of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Mt. Pleasant, PA. The project will be completed this fall.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT advises motorists to use caution, &lt;u&gt;slow down&lt;/u&gt;, and expect changing traffic patterns when traveling through the area. Work zone safety is everyone’s responsibility. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Thu, 03 Jul 2008 16:55:54 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/347-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 3, 2008 - ROUTE 2010 LOVEDALE ROAD BRIDGE REPLACEMENT BEGIN MONDAY IN LINCOLN</title>
    <link>http://expectdelays.com/cblog/archives/346-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-2010-LOVEDALE-ROAD-BRIDGE-REPLACEMENT-BEGIN-MONDAY-IN-LINCOLN.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/346-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-3,-2008-ROUTE-2010-LOVEDALE-ROAD-BRIDGE-REPLACEMENT-BEGIN-MONDAY-IN-LINCOLN.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=346</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=346</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh, PA &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;– &lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;Pittsburgh, PA&lt;/span&gt;&lt;/b&gt;– PennDOT District 11&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; &lt;/span&gt;&lt;/b&gt;is pleased to announce construction activities to replace a small bridge on Route 2010 (Lovedale Road) in Lincoln Borough, Allegheny County, will begin on Monday, July 7, 2008.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The bridge is located on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Lovedale Road between Jacktown Road Extension and Route 2023 (Harrison Hollow Road). To allow the necessary work to be completed, Route 2010 (Lovedale Road) will be closed to thru-traffic beginning at 7 a.m. on Monday, July 7, 2008. Route 2010 (Lovedale Road) will remain closed for approximately six weeks through mid-August 2008. About 8,800 vehicles use this area of Route 2010 (Lovedale Road).   &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;i&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-STYLE: italic&quot;&gt;Note: This project was originally scheduled to occur in May, but was postponed to minimize impacts on school buses&lt;/span&gt;&lt;/i&gt;&lt;font size=&quot;3&quot;&gt;. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The suggested detour is shown below:&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 6pt; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Eastbound:&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Take right off Route 2010 (Lovedale Road) onto Route 2008 (Mill Hill Road) &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Left onto Scenery Drive/Route 48&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Return to Route 2010 (Lovedale Road)&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Westbound:&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;South on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Scenery Drive/Route 48 &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Right onto Route 2008 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Mill Hill Road) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Return to Route 2010 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Lovedale Road) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The closure is necessary as contractor crews remove and replace the bridge with a large pipe. The contractor performing the $70,000 project is Thornbury, Inc of Sunbury PA. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Motorists are advised to use caution and allow extra time when traveling through the area. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Thu, 03 Jul 2008 16:53:39 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/346-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 2, 2008 - ROUTE 28 SAFETY IMPROVEMENTS CONTINUE MONDAY</title>
    <link>http://expectdelays.com/cblog/archives/342-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-ROUTE-28-SAFETY-IMPROVEMENTS-CONTINUE-MONDAY.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/342-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-ROUTE-28-SAFETY-IMPROVEMENTS-CONTINUE-MONDAY.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=342</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=342</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215023497_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Pittsburgh, PA&lt;/span&gt; &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;– PennDOT District 11 is advising motorists work to install median cable guide rail on Route 28 (Allegheny Valley Expressway) between the Creighton (Exit 13) and Tarentum (Exit 14) interchanges in East Deer and Fawn townships and the borough of Tarentum, &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215023497_3&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Allegheny County&lt;/span&gt;, will continue on Monday, July 7, 2008. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;To allow the necessary work to occur, left lane closures will occur daily in both directions on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Route 28 through Thursday, July 10, 2008. &lt;u&gt;Traffic will not be restricted during peak periods northbound and southbound&lt;/u&gt;. Any necessary restrictions and lane closures will occur according to the following schedule: &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Northbound (outbound): &lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.75in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;6 a.m. to 3 p.m. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Southbound (inbound): &lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.75in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;11 a.m. to 6 p.m. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The lane closures are necessary as crews install a high tension cable barrier system and guide rail in the median on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Route 28 as a safety improvement to prevent crossover crashes. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The prime contractor for the $225,000 project is Green Acres Contracting Co. Inc. of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215023497_4&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Scottdale, PA&lt;/span&gt;. PennDOT advises motorists to slow down and use caution when traveling through the area.  Work zone safety is everyone’s responsibility.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Wed, 02 Jul 2008 14:32:29 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/342-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 2, 2008 - PARKWAY WEST INBOUND LANE CLOSURE THURSDAY IN ROBINSON</title>
    <link>http://expectdelays.com/cblog/archives/341-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-PARKWAY-WEST-INBOUND-LANE-CLOSURE-THURSDAY-IN-ROBINSON.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/341-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-PARKWAY-WEST-INBOUND-LANE-CLOSURE-THURSDAY-IN-ROBINSON.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=341</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=341</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215005651_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Pittsburgh, PA&lt;/span&gt; &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;– PennDOT District 11 is advising motorists single lane traffic will occur on the inbound (eastbound) Parkway West (I-279/Route 22/30) between Boyce Road and the I-79 interchange in Robinson Township, Allegheny County, weather permitting, on Thursday, July 3, 2008.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Any necessary lane closures will only occur between &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;9 a.m.-3 p.m. Thursday. Crews will be repairing guiderail and crash attenuators along a quarter mile of the Parkway West.  Motorists should be prepared for possible delays and changing traffic patterns. Slow down and be safe. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The work is part of the $67.5 million I-79 Parkway West “missing ramps” project. The project is constructing two ramps connecting I-79 to the Parkway West (I-279/Route 22/30). The project will also widen existing ramps, construct two bridge structures, one culvert, two retaining walls, add highway lighting, increase the existing intelligent transportation system, install variable message signs and cameras, drainage, guide rail, traffic signal work, signing, pavement markings, rumble strips and other miscellaneous construction. Construction will conclude in 2009. The prime contractor for the project is Balfour Beatty Construction, Inc. of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215005651_3&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Canonsburg, PA&lt;/span&gt;.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Visit &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/district11&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215005651_4&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;www.dot.state.pa.us/district11&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt; for more information on PennDOT District 11.  &lt;/font&gt;&lt;/span&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Wed, 02 Jul 2008 09:34:39 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/341-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 2, 2008 - I-79 OVERPASS IMPROVEMENTS SET TO BEGIN IN PLAIN GROVE TOWNSHIP JULY 14</title>
    <link>http://expectdelays.com/cblog/archives/340-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-I-79-OVERPASS-IMPROVEMENTS-SET-TO-BEGIN-IN-PLAIN-GROVE-TOWNSHIP-JULY-14.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/340-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-2,-2008-I-79-OVERPASS-IMPROVEMENTS-SET-TO-BEGIN-IN-PLAIN-GROVE-TOWNSHIP-JULY-14.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=340</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=340</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; – &lt;/span&gt;&lt;/b&gt;District 11&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; &lt;/span&gt;&lt;/b&gt;is advising motorists that work to improve two bridges that carry Pollock Store Road and Brent Road over I-79 in Plain Grove Township, Lawrence County, will begin on July, 14, 2008.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Both bridges will be closed to traffic around-the-clock while the work is performed beginning at &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;6 a.m. on Monday, July 14, through mid-September 2008. Crews will conduct substructure repairs, bridge deck resurfacing, and drainage improvements on both bridges. The following restrictions will occur: &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Brent Road&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; Overpass&lt;/span&gt;&lt;/u&gt;:&lt;/b&gt; Brent Road will be open to local traffic only from Jarvis Road to Plain Grove Road; thru-traffic will not be permitted.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Posted detour route:&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;u&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;From West: &lt;/span&gt;&lt;/font&gt;&lt;/u&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;ul type=&quot;square&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn left onto &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Jarvis Road (1.5 miles) to Plain Grove-North Liberty Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right onto Plain Grove (2.9 miles) follow to &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Brent Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;End of Detour&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;u&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;From East:&lt;/span&gt;&lt;/font&gt;&lt;/u&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;ul type=&quot;square&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traveling on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Brent Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Plain Grove Road (2.9 miles) follow to Plain Grove-North Liberty Road (2.1 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Bare left onto &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Jarvis Road  and follow to Brent Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;End of Detour&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;/font&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pollock Store Road&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;:&lt;/span&gt;&lt;/b&gt; Pollock Store Road will be open from Moores Corner to Plain Grove Road for local traffic only; thru-traffic will not be permitted. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Posted detour route:&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;u&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;From West:&lt;/span&gt;&lt;/font&gt;&lt;/u&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;ul type=&quot;square&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Plain Grove Road northbound (0.8 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Plain Grove-North Liberty Road (1.9 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Moores Corner Road (1.2 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Return to &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Pollock Store Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;End of Detour&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 1.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;u&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;From East:&lt;/span&gt;&lt;/font&gt;&lt;/u&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;ul type=&quot;square&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Moores Corner Road northbound (1.2 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn left on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Plain Grove-North Liberty Road (1.9 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn left on &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Plain Grove Road (0.8 miles) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Return to &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Pollock Store Road &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;End of Detour&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;/ul&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The bridge improvements are part of a $10.7 million project that includes concrete patching, bituminous superpave overlay, bridge repairs and resurfacing, shoulder, drainage and guide rail upgrades and other improvements on approximately 5.4 miles of I-79 through &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Lawrence County from the Mercer County line to the Butler County line. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;/font&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Single lane closures and other restrictions are occurring daily on I-79 in the work zone daily from &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;7 a.m. to 5 p.m. Some night and weekend work will also occur. The overall project will be completed in late fall 2008. The prime contractor is the I. A. Construction Company, Inc. of &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1215002841_2&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Zelienople, PA&lt;/span&gt;.   &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Motorists are advised to use caution, be prepared for changing traffic patterns, and allow extra time when traveling through the area. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Wed, 02 Jul 2008 08:48:29 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/340-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 1, 2008 - PARKWAY EAST MAINLINE WORK POSTPONED THROUGH UPCOMING WEEKEND</title>
    <link>http://expectdelays.com/cblog/archives/339-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-PARKWAY-EAST-MAINLINE-WORK-POSTPONED-THROUGH-UPCOMING-WEEKEND.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/339-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-PARKWAY-EAST-MAINLINE-WORK-POSTPONED-THROUGH-UPCOMING-WEEKEND.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=339</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=339</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966348_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;/font&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; &lt;/span&gt;&lt;/b&gt;– PennDOT District 11 is advising motorists that no mainline work or construction activities are currently scheduled on the Parkway East (I-376) in &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966348_3&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Allegheny County&lt;/span&gt; until next week.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;All mainline work has been postponed this week through the upcoming July 4 holiday weekend. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Additional details will be released later for work that will occur next week. Mainline and ramp work is tentative scheduled to resume on Monday night, July 7.    &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; Schedule&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;TEXT-INDENT: 0in; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;u&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;July 1-6: &lt;/span&gt;&lt;/font&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;No mainline work is scheduled.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic on Route 130 (&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Beulah Road&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;) under the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; between Route 2110 (&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;William Penn Highway&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;) and &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Churchill Road&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; (Route 2104) will be restricted to a single lane in each direction around-the-clock through July 2. Crews will be performing bridge repairs on the overhead structure. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Shoulder closures may occur in various locations on the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; in both directions daily from &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;9 a.m.&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; to &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;3 p.m.&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; through July 2 for drainage and paving preparation activities.  &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 42pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Chestnut&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Street&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Bridge&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; over the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; will remain fully closed around-the-clock through this week. Bridge deck replacement is occurring. Signs are posted to guide motorists. Traffic is be detoured using &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Elm Street&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; to &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pennwood Avenue&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; to &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Edgewood Avenue&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; to &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Oakview Street&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Similar to the work that has occurred on the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Parkway East over the past two construction seasons, the 2.92 mile, $22.8 mile project for 2008 includes concrete pavement patching and bituminous overlay, milling and resurfacing of mainline and interchange ramps, drainage, guide rail and end treatment upgrades, shoulder improvements, bridge preservation work on 15 structures (including three structurally deficient (SD) bridges that will be removed from the SD list once the project is completed), acceleration and deceleration ramp lengthening, signing and pavement markings, and other miscellaneous construction on the Parkway East in the City of Pittsburgh and the Boroughs of Swissvale, Edgewood, Braddock Hills, Wilkinsburg, Forest Hills and Churchill. The project begins at the bridge over South Braddock Avenue at the Edgewood/Swissvale interchange and concludes at the bridge over Route 2048 (Business Route 22) in Churchill. &lt;span lang=&quot;EN&quot;&gt;The project will be completed in late 2008.  T&lt;/span&gt;he prime contractors for the project are the Trumbull Corporation of West Mifflin in a joint venture with Lindy Paving Inc. of New Castle. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;To help keep motorists informed of construction activities and traffic restrictions on the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Parkway East, PennDOT has established a website specifically for the project. The website, &lt;/font&gt;&lt;/font&gt;&lt;a href=&quot;http://www.penndot11.com/&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966348_4&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot; size=&quot;3&quot;&gt;www.penndot11.com&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot; size=&quot;3&quot;&gt;, provides information on the project, details on current construction activities and traffic restrictions and other useful information. In addition, website visitors can register for email updates that will be sent weekly for upcoming work and restrictions.  PennDOT has also created a hotline number for road construction information. The number, &lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966348_5&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;412-429-6035&lt;/span&gt;&lt;/span&gt;&lt;/u&gt;&lt;/b&gt;, provides current traffic restrictions and other useful information on the Parkway East project and other key improvements in the region.   &lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The project continues PennDOT District 11’s efforts to improve the entire length of the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Parkway East from the Fort Pitt Bridge in the City of Pittsburgh to the &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966348_6&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Pennsylvania Turnpike&lt;/span&gt; in the Municipality of Monroeville. The past two construction seasons addressed the Parkway East from the Fort Pitt Bridge to the Bates Street Interchange (Exit 3) in 2006 and from Bates Street to just beyond the Edgewood Swissvale Interchange (Exit 7) in 2007. The remaining section of the Parkway East from Churchill to the Turnpike will be addressed in 2009-2010. District 11 is conducting these improvements to preserve, protect, improve and revitalize an essential Interstate corridor in Western Pennsylvania’s infrastructure.           &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Tue, 01 Jul 2008 22:39:22 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/339-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 1, 2008 - MONTOUR CHURCH ROAD BRIDGE OVER ROUTE 22 CLOSED TO TRAFFIC</title>
    <link>http://expectdelays.com/cblog/archives/338-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-MONTOUR-CHURCH-ROAD-BRIDGE-OVER-ROUTE-22-CLOSED-TO-TRAFFIC.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/338-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-MONTOUR-CHURCH-ROAD-BRIDGE-OVER-ROUTE-22-CLOSED-TO-TRAFFIC.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=338</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=338</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT District 11 is advising motorists the bridge that carries &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Montour Church Road over Route 22/30 at the Steubenville Pike (Tonidale) Interchange west of the Route 60 interchange in North Fayette Township, Allegheny County, is currently closed to traffic today, Tuesday, July 1, 2008. In addition, Route 22/30 is restricted to a single lane in the inbound (eastbound) direction. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT is closing the bridge as a precaution after inspection crews identified a crack in a bridge beam. The crack is believed to be caused by over-height vehicles hitting the bridge. Repair work is expected to begin this evening. The bridge will remain closed and eastbound traffic on Route 22/30 will be restricted around-the-clock until repairs are completed. Westbound (outbound) traffic on Route 22/30 will also be restricted to a single lane while the repair work is underway.    &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The bridge is owned by PennDOT, but is located on a local road owned by &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;North Fayette Township. About 7,600 vehicles use the bridge on an average day. PennDOT is currently designing a replacement structure for the Montour Church Road bridge over Route 22 with adequate under-clearance. The bridge replacement project should be under construction in 2010.   &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Tue, 01 Jul 2008 22:35:59 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/338-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JULY 1, 2008 - ROUTE 51 WEST CARSON STREET RESURFACING CONTINUES WEDNESDAY NIGHT</title>
    <link>http://expectdelays.com/cblog/archives/337-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-ROUTE-51-WEST-CARSON-STREET-RESURFACING-CONTINUES-WEDNESDAY-NIGHT.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/337-PENNDOT-TRAFFIC-NEWS-RELEASE-JULY-1,-2008-ROUTE-51-WEST-CARSON-STREET-RESURFACING-CONTINUES-WEDNESDAY-NIGHT.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=337</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=337</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;– PennDOT District 11 is advising motorists that mechanical patching (milling and resurfacing) will continue on Route 51 (West Carson Street) between Corliss Street and the West End Circle (Route 19) in the &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966018_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;City of Pittsburgh&lt;/span&gt;, &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966018_3&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Allegheny County&lt;/span&gt;, on Wednesday night, July 2, 2008. Due to inclement weather, crews were unable to complete the work last week.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;To allow the milling and resurfacing operations to occur, southbound (inbound) Route 51 will be closed to traffic from &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;8 p.m. on Wednesday night through 6 a.m. on Thursday morning. Northbound (outbound) traffic will be reduced to a single lane through the work zone. Signs will be posted to guide motorists.   &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Posted Southbound Detour (see attached map):&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right off the southbound Route 51 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;West Carson Street) onto Corliss Street &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Follow &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Corliss Street to Chartiers Avenue &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Make left onto &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Chartiers Avenue &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Follow &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Chartiers Avenue to Steuben Street &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take left onto &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Steuben Street &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Follow &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Steuben Street back to &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966018_4&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;West End&lt;/span&gt; and Carson Street   &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;i&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-STYLE: italic&quot;&gt;Note: Due to the height restriction in the Corliss Tunnel, southbound trucks over 11’ 7” in height will be flagged through the work zone, which will require stoppages of northbound traffic. &lt;u&gt;Trucks are urged to find alternate routes to avoid traffic disruptions&lt;/u&gt;&lt;/span&gt;&lt;/i&gt;&lt;/b&gt;&lt;i&gt;&lt;u&gt;&lt;span style=&quot;FONT-STYLE: italic&quot;&gt;&lt;font size=&quot;3&quot;&gt;.   &lt;/font&gt;&lt;/span&gt;&lt;/u&gt;&lt;/i&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;i&gt;&lt;u&gt;&lt;span style=&quot;FONT-STYLE: italic&quot;&gt;&lt;/span&gt;&lt;/u&gt;&lt;/i&gt;&lt;/font&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Crews from PennDOT’s &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Allegheny County maintenance unit will be performing the emergency milling and resurfacing operations on sections of West Carson Street that have deteriorated significantly. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PennDOT advises motorists to &lt;b&gt;&lt;u&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;expect delays&lt;/span&gt;&lt;/u&gt;&lt;/b&gt; and changing traffic patterns when traveling through the area.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Visit &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/district11&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214966018_5&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;www.dot.state.pa.us/district11&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt; for more information on PennDOT District 11. &lt;/font&gt;&lt;/span&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Tue, 01 Jul 2008 22:32:51 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/337-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JUNE 30,  2008 -I-279/ROUTE 28 LANE CLOSURES CONTINUE TUESDAY ON NORTH SIDE</title>
    <link>http://expectdelays.com/cblog/archives/334-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-30,-2008-I-279ROUTE-28-LANE-CLOSURES-CONTINUE-TUESDAY-ON-NORTH-SIDE.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/334-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-30,-2008-I-279ROUTE-28-LANE-CLOSURES-CONTINUE-TUESDAY-ON-NORTH-SIDE.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=334</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=334</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214904035_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;/font&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; &lt;/span&gt;&lt;/b&gt;– PennDOT District 11 is advising motorists that single lane closures will continue through July on Interstate 279 (Parkway North), Route 28 and several ramps on the North Side in the &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214904035_3&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;City of Pittsburgh&lt;/span&gt;, Allegheny County, beginning Tuesday, July 1, 2008.  &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The lane closures will occur daily as needed from &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;10 a.m. to 2 p.m. and nightly from 9 p.m. to 5 a.m. through late July. Periodic traffic stoppages may also occur on the Canal Street ramp. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The single lane closures will occur at the following locations:&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;I-279&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Northbound (outbound) from the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Route 28 split to East Ohio Street overpass &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Southbound (inbound) from the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Anderson Street underpass to the East Ohio Street overpass &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Route 28&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;From the Heinz Plant to &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Anderson Street &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Madison Avenue&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Between &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Route &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214904035_4&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;28 and East Ohio&lt;/span&gt; Street on Madison Avenue &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Canal Street ramp&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Between &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;East Ohio Street and I-279 &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The work is part of a $7.9 million project that will improve traffic flow and mobility by constructing a new ramp to allow southbound &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Route 28 traffic to travel directly onto I-279 south. Currently, the movement requires exiting from Route 28 onto East Ohio Street traveling through three signalized intersections to access I-279. The new ramp when completed will allow free flowing traffic between southbound Route 28 and southbound I-279. The prime contractor for the project is the Brayman Construction Corporation of &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214904035_5&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Saxonburg, PA&lt;/span&gt;. The project will be completed in September 2008. For more information and digital renderings of the ramp, go to &lt;/font&gt;&lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214904035_6&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot; size=&quot;3&quot;&gt;www.dot.state.pa.us&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot; size=&quot;3&quot;&gt;, click “PennDOT Near You, “11” on the map, “Roadwork” and then “Featured Construction Projects”.  &lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Tue, 01 Jul 2008 05:21:03 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/334-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JUNE 30, 2008 - PARKWAY WEST SINGLE LANE TRAFFIC MONDAY NIGHT IN ROBINSON</title>
    <link>http://expectdelays.com/cblog/archives/333-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-30,-2008-PARKWAY-WEST-SINGLE-LANE-TRAFFIC-MONDAY-NIGHT-IN-ROBINSON.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/333-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-30,-2008-PARKWAY-WEST-SINGLE-LANE-TRAFFIC-MONDAY-NIGHT-IN-ROBINSON.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=333</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=333</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214828045_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Pittsburgh, PA&lt;/span&gt; – &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;PennDOT District 11 is advising motorists that traffic on the Parkway West (I-279/Route 22/30) will be reduced to single lane in each direction between the I-79 Interchange and the Campbells Run Road/Boyce Road ramps in Robinson Township, Allegheny County, on Monday night, June 30, 2008, weather permitting. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The lane restrictions are necessary as contractor crews remove and reset concrete median barriers. To minimize impacts on the traveling public, the lane restrictions will only occur between &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;10 p.m. on Monday to 5 a.m. on Tuesday, July 1. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Motorists should be prepared for possible delays and changing traffic patterns. Slow down and be safe. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The work is part of the $67.5 million I-79 Parkway West “missing ramps” project. The project is constructing two ramps connecting I-79 to the Parkway West (I-279/Route 22/30). The project will also widen existing ramps, construct two bridge structures, one culvert, two &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214828045_3&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;retaining walls&lt;/span&gt;, add highway lighting, increase the existing intelligent transportation system, install variable message signs and cameras, drainage, guide rail, traffic signal work, signing, pavement markings, rumble strips and other miscellaneous construction. Construction will conclude in 2009. The prime contractor for the project is Balfour Beatty Construction, Inc. of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214828045_4&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Canonsburg, PA&lt;/span&gt;.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Visit &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/district11&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214828045_5&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;www.dot.state.pa.us/district11&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt; for more information on PennDOT District 11.  &lt;/font&gt;&lt;/span&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Mon, 30 Jun 2008 08:14:37 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/333-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JUNE 27, 2008 - ROUTE 65 RAMP REPAIRS BEGIN TUESDAY IN FREEDOM</title>
    <link>http://expectdelays.com/cblog/archives/332-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-27,-2008-ROUTE-65-RAMP-REPAIRS-BEGIN-TUESDAY-IN-FREEDOM.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/332-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-27,-2008-ROUTE-65-RAMP-REPAIRS-BEGIN-TUESDAY-IN-FREEDOM.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=332</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=332</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214617221_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;/font&gt;&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt; &lt;/span&gt;&lt;/b&gt;– PennDOT District 11 is advising motorists work to repair a ramp over Route 65 (Ohio River Boulevard) in the borough of Freedom, Beaver County, will begin on Tuesday, July 1, 2008, weather permitting.&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Crews will be conducting substructure steel repairs on the ramp from southbound Route 65 to &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Third Avenue. To allow the necessary work to occur, single lane closures will occur on Route 65 daily from 7 a.m. to 4 p.m. through Tuesday, July 8. No work will occur on July 4 and lane closures will be lifted during peak periods in either direction. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The work in included in a contract with Thornbury, Inc. of &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214617221_3&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;Sunbury, PA&lt;/span&gt; for bridge repairs in various locations in PennDOT District 11.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Motorists are advised to use caution, be prepared for changing traffic patterns, and allow extra time when traveling through the area.  &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Fri, 27 Jun 2008 21:40:44 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/332-guid.html</guid>
    
</item>
<item>
    <title>PENNDOT TRAFFIC NEWS RELEASE JUNE 27, 2008 - PENNDOT WEEKEND CONSTRUCTION SUMMARY JUNE 27-30</title>
    <link>http://expectdelays.com/cblog/archives/331-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-27,-2008-PENNDOT-WEEKEND-CONSTRUCTION-SUMMARY-JUNE-27-30.html</link>
            <category>Pittsburgh PENNDOT Traffic News Releases</category>
    
    <comments>http://expectdelays.com/cblog/archives/331-PENNDOT-TRAFFIC-NEWS-RELEASE-JUNE-27,-2008-PENNDOT-WEEKEND-CONSTRUCTION-SUMMARY-JUNE-27-30.html#comments</comments>
    <wfw:comment>http://expectdelays.com/cblog/wfwcomment.php?cid=331</wfw:comment>

    <slash:comments>0</slash:comments>
    <wfw:commentRss>http://expectdelays.com/cblog/rss.php?version=2.0&amp;type=comments&amp;cid=331</wfw:commentRss>
    

    <author>nospam@example.com (Ms. Gus)</author>
    <content:encoded>
    &lt;p style=&quot;TEXT-INDENT: 0in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_2&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;, &lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;PA&lt;/span&gt;&lt;/b&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; – PennDOT District 11 is advising motorists that highway construction activities will be occurring this weekend, &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;June 27-30, 2008&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;, in &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Allegheny&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;County&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;. Below is a summary of the major closings and restrictions. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;TEXT-INDENT: 0in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Motorists should allow extra time and plan their travels accordingly. Be prepared for highway work zones, slow down and be safe. For more information, call PennDOT’s automated construction hotline at &lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_3&quot; style=&quot;BACKGROUND: none transparent scroll repeat 0% 0%; CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;412-429-6035&lt;/span&gt; or visit the District 11 website, &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_4&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;www.dot.state.pa.us&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;, click PennDOT near you, “11” under “roadwork”. All activities are weather permitting.   &lt;/font&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;TEXT-INDENT: 0in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;I-376 (&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;)&lt;/span&gt;&lt;/b&gt;&lt;/font&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;No work or construction activities are currently scheduled on the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Parkway East (I-376) in Allegheny County this weekend as part of the improvement project between Exits 7-10. &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;u&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;No mainline&lt;/span&gt;&lt;/u&gt;&lt;font size=&quot;3&quot;&gt; work is scheduled. &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic on Route 130 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Beulah Road) under the Parkway East between Route 2110 (William Penn Highway) and Churchill Road (Route 2104) will be restricted to a single lane in each direction around-the-clock through July 2. &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Chestnut Street Bridge over the Parkway East will remain fully closed around-the-clock through next week. Traffic is be detoured using Elm Street to Pennwood Avenue to Edgewood Avenue to Oakview Street. &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/ed45803ffb51ed1d85257473006fabc3?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_5&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;PARKWAY EAST WORK CANCELLED THROUGH UPCOMING WEEKEND&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Single lane closures will occur on the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Parkway East (I-376) in both directions between the Boulevard of the Allies (Exit 2) and Bates Street (Exit 3) from 5:30 a.m. to 10 a.m. on Saturday, June 28, 2008 for median barrier repairs. &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 1in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/7b6bb0fe871b1eb48525747500505b08?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_6&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;I-376 PARKWAY EAST MEDIAN BARRIER REPAIRS OCCUR SATURDAY MORNING&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;I-279 (Parkway West)&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Inspection activities on the I-279 Fort Pitt Bridge in the City of &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Pittsburgh will be postponed this weekend due to the Tour of PA Bike Race.  Inspection activities will resume next weekend. &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The ramp from northbound Route 51/19 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Saw Mill Run Boulevard) to the outbound (southbound) Parkway West (I-279) in the City of Pittsburgh will be closed this weekend beginning at 8 p.m. tonight, Friday, June 27, and will continue around-the-clock through 6 a.m. on Monday, June 30. Signs will be posted to guide motorists during the closure. The posted detour will be: &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Continue northbound on Route 51/19 to the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;West End Circle &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Travel through &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_7&quot; style=&quot;CURSOR: hand; BORDER-BOTTOM: #0066cc 1px dashed&quot;&gt;West End&lt;/span&gt; Circle looping back to southbound Route 51 &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take the southbound ramp from Route 51 to the outbound Parkway West &lt;/span&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Note: Detour map is attached.&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/c1a1fb4309932a1d85257475004d3a43?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_8&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;NORTHBOUND ROUTE 51/19 (SAW MILL RUN BOULEVARD) RAMP TO OUTBOUND PARKWAY WEST CLOSED THIS WEEKEND&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic will be reduced to a single lane on the outbound (southbound) Parkway West (I-279) in the area of the Route 121 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Greentree Road) interchange (Exit 4A) and the outbound Parkway West off-ramp to Greentree Road will be closed this weekend. Inbound traffic will not be affected at this time. Signs will be posted to guide motorists during the off-ramp closure. Ramp traffic will be detoured using the Parkway Center exit (Exit 4B) from the outbound Parkway West prior to the Greentree interchange. The right lane, exit lane and ramp closure on the outbound Parkway West will occur according to the following schedule: &lt;/font&gt;&lt;/font&gt;&lt;/p&gt;&lt;p /&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;June 27-28&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;: Midnight Friday to 10 p.m. Saturday &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;June 28-29&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;: Midnight Saturday to 3 p.m. Sunday &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;June 29-30&lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;: 6 p.m. Sunday to 6 a.m. Monday &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;June 30-July 3: &lt;/span&gt;&lt;/b&gt;&lt;font size=&quot;3&quot;&gt;Nightly from 8 p.m. to 6 a.m. Monday through Thursday &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p /&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/8305fcec3199601085257475005088fa?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_9&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;OUTBOUND PARKWAY WEST SINGLE LANE TRAFFIC AT GREENTREE ROAD THIS WEEKEND&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;font face=&quot;times new roman,times,serif&quot; size=&quot;3&quot;&gt;  &lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;I-279 (Parkway North)&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic on outbound (northbound) Interstate 279 (Parkway North) in the area of the Route 19 overpass (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Perrysville Avenue Bridge) in Ross Township will be reduced to single lane this weekend begin at 10 p.m. tonight, Friday, June 27, and will continue around-the-clock through 6 a.m. on Monday, June 30. The Parkway North carries three lanes of outbound traffic in this area. Two outbound lanes will be closed allowing one lane to remain open as crews continue work to paint the Route 19 overpass (Perrysville Avenue Bridge). Inbound traffic will not be affected at this time. &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/d0994118fc4a2f20852574750057bb33?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_10&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;PARKWAY NORTH OUTBOUND SINGLE LANE TRAFFIC AT PERRYSVILLE OVERPASS THIS WEEKEND&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;I-79&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Southbound Interstate 79 will be reduced to a single lane from the I-279 split to the &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Neville Island Bridge this weekend from 7 p.m. Friday to 6 a. m. Monday &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;b&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Route 65&lt;/span&gt;&lt;/font&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul type=&quot;disc&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Traffic on northbound Route 65 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Ohio River Boulevard) is reduced to a single 11-foot wide lane in the area of the I-79 Neville Island Bridge and the on-ramp to Route 65 from the Kilbuck Street Viaduct is closed around-the-clock through mid-July. Signs are posted to guide motorists around the closed ramp to Route 65. The posted detour is: &lt;/font&gt;&lt;/font&gt;&lt;ul type=&quot;circle&quot;&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take I-79 southbound to Exit 65 (&lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Neville Island) &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Turn right onto &lt;/span&gt;&lt;font size=&quot;3&quot;&gt;Grand Avenue &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Follow signs to northbound I-79 &lt;/span&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Re-enter I-79 northbound&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;li style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Take the I-79 northbound off-ramp to Route 65/Glenfield Road (Exit 66)&lt;/span&gt;&lt;font size=&quot;3&quot;&gt; &lt;/font&gt;&lt;/font&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p style=&quot;MARGIN-LEFT: 0.25in; LINE-HEIGHT: 150%&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;Full Press Release: &lt;/font&gt;&lt;a href=&quot;http://www.dot.state.pa.us/penndot/districts/district11.nsf/7580f0e72f1809df852570a70047899b/032e3a79f8aa03a0852574630044787d?OpenDocument&quot; target=&quot;_blank&quot; rel=&quot;nofollow&quot;&gt;&lt;span class=&quot;yshortcuts&quot; id=&quot;lw_1214592406_11&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot; color=&quot;#003399&quot;&gt;ROUTE 65 LANE CLOSURE BEGINS WEDNESDAY IN OHIO TOWNSHIP&lt;/font&gt;&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold; FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Forbes Avenue&lt;/span&gt;&lt;/b&gt;&lt;b&gt;&lt;span style=&quot;FONT-WEIGHT: bold&quot;&gt;&lt;font size=&quot;3&quot;&gt;/Boulevard of the Allies&lt;/font&gt;&lt;/span&gt;&lt;/b&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Forbes Avenue&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; (Route 2108) is reduced to a single lane from &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Moultrie Street&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; to &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;McDevitt Place&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; (approximately 2,500 feet) around-the-clock through late August 2008 in the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Oakland&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; area of the City of &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Pittsburgh&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;, &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Allegheny&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;County&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;. Traffic on &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Forbes Avenue&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; is required to stop at the merge point with traffic from the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; off-ramp (traffic from the &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Parkway East&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; will be free-flowing). &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;MARGIN-LEFT: 0.5in; LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%; FONT-FAMILY: Symbol&quot;&gt;·&lt;span style=&quot;FONT: 7pt &#039;Times New Roman&#039;&quot;&gt;&lt;font size=&quot;3&quot;&gt;        &lt;/font&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;The bridge that carries the Boulevard of the Allies over &lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Forbes Avenue&lt;/span&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; is also closed for replacement through this fall.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;&lt;p style=&quot;LINE-HEIGHT: 150%&quot;&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt; &lt;/span&gt;&lt;/font&gt;&lt;font face=&quot;times new roman,times,serif&quot;&gt;&lt;span style=&quot;FONT-SIZE: 12pt; LINE-HEIGHT: 150%&quot;&gt;Please be safe and slow down in highway work zones. &lt;/span&gt;&lt;/font&gt;&lt;/p&gt;  
    </content:encoded>

    <pubDate>Fri, 27 Jun 2008 14:49:22 -0700</pubDate>
    <guid isPermaLink="false">http://expectdelays.com/cblog/archives/331-guid.html</guid>
    
</item>

</channel>
</rss>